0,00 €
Zum Warenkorb
  • KVM Verlag
Filter
Leon G. Horrichs

Implants for the Anterior Maxillary Region

50 Minutes

Category: Implantology
Language(s): English, German
Publication year: 2003
Video source: ZMK-Live

Contents

  • Implant planning and positioning
  • Preparation
  • Drilling and thread-cutting
  • Implant insertion
  • Wound closure

Synopsis
The implant position is determined using a drill guide/x-ray template (regions 34-32-42-44). A Peeso drill is inserted in the drill guide and used to mark the position in the mucoperiosteum. An incision is made, and the mucoperiosteum is displaced.
The implant insertion sites are prepared by using a 2 mm twist drill, 2/3 mm pilot drill, 3 mm and 3/5 mm twist drills. This is followed by counter-drilling and thread-cutting. The implants were loaded at 40-50 N. The wound is then closed using GORE-TEX® suture material.

Recommended videos

  
free

Eclipse, Werkstoff für Aufbisschienen, Basisplatten und Interimsprothesen

Peter Schwieren

Length: 15 minutes
Production year: 2006
Language: German, English
Series: Dental Video Magazin
Category: Dental Technology
available since: 30. Aug 2007

free

Tooth shades: An update

Alexander Hassel

Length: 29 minutes
Production year: 2012
Language: English, German
Series: Dental Video Journal
available since: 4. Apr 2012

Harvesting a thick mucosal graft from the lateral palate

Marc Hürzeler / Otto Zuhr

Length: 8 minutes
Production year: 2013
Language: English, German
Series: Zuhr-Hürzeler DVD-Kompendium
Categories: Implantology, Surgery, Periodontics
available since: 22. Apr 2016