0,00 €
Zum Warenkorb
  • KVM Verlag
Filter
Leon G. Horrichs

Implants for the Anterior Maxillary Region

50 Minuten

Rubrik(en): Implantologie
Sprache(n): Englisch, Deutsch
Publikationsjahr: 2003
Video-Quelle: ZMK-Live

Contents

  • Implant planning and positioning
  • Preparation
  • Drilling and thread-cutting
  • Implant insertion
  • Wound closure

Synopsis
The implant position is determined using a drill guide/x-ray template (regions 34-32-42-44). A Peeso drill is inserted in the drill guide and used to mark the position in the mucoperiosteum. An incision is made, and the mucoperiosteum is displaced.
The implant insertion sites are prepared by using a 2 mm twist drill, 2/3 mm pilot drill, 3 mm and 3/5 mm twist drills. This is followed by counter-drilling and thread-cutting. The implants were loaded at 40-50 N. The wound is then closed using GORE-TEX® suture material.

Empfohlene Videos

  
frei

Ästhetische Korrekturen mit Komposit - Es geht besser als man glaubt!

Bernd Klaiber

Länge: 24 Minuten
Produktionsjahr: 2009
Sprache: Deutsch
Quelle: 60 Jahre Quintessenz
Kategorien: Zahnerhaltung, Ästhetische Zahnheilkunde
verfügbar seit: 8. Feb. 2010

frei

Weichgewebsaufbau am Implantat 11 vor prothetischer Versorgung

Kai Fischer

Produktionsjahr: 2019
Sprache: Deutsch
Quelle: dentory
Kategorie: Parodontologie
verfügbar seit: 16. Juli 2019

Harvesting a block bone graft from the lateral mandibular angle

Marc Hürzeler / Otto Zuhr

Länge: 6 Minuten
Produktionsjahr: 2013
Sprache: Englisch, Deutsch
Reihen: Zuhr-Hürzeler DVD-Kompendium
Kategorien: Implantologie, Chirurgie, Parodontologie
verfügbar seit: 22. Apr. 2016