0,00 €
Zum Warenkorb
  • QP Australia+New Zealand
Filter
Leon G. Horrichs

Implants for the Anterior Maxillary Region

50 Minuten

Rubrik(en): Implantologie
Sprache(n): Englisch, Deutsch
Publikationsjahr: 2003
Video-Quelle: ZMK-Live

Contents

  • Implant planning and positioning
  • Preparation
  • Drilling and thread-cutting
  • Implant insertion
  • Wound closure

Synopsis
The implant position is determined using a drill guide/x-ray template (regions 34-32-42-44). A Peeso drill is inserted in the drill guide and used to mark the position in the mucoperiosteum. An incision is made, and the mucoperiosteum is displaced.
The implant insertion sites are prepared by using a 2 mm twist drill, 2/3 mm pilot drill, 3 mm and 3/5 mm twist drills. This is followed by counter-drilling and thread-cutting. The implants were loaded at 40-50 N. The wound is then closed using GORE-TEX® suture material.

Empfohlene Videos

  

6. Vertical External Mattress Suture

Giulio Rasperini

Länge: 1 Minuten
Produktionsjahr: 2013
Sprache: Englisch
Reihen: Suturing Techniques
Kategorien: Nahttechniken, Chirurgie
verfügbar seit: März 15, 2015

frei

Die elektrische Zahnbürste

Länge: 2 Minuten
Produktionsjahr: 2011
Sprache: Deutsch
Quelle: Mein Patient - Mundhygiene
Kategorie: Mundhygiene
verfügbar seit: August 26, 2011

frei

Sanftes Zähneputzen

Länge: 2 Minuten
Produktionsjahr: 2011
Sprache: Deutsch
Quelle: Mein Patient - Mundhygiene
Kategorie: Mundhygiene
verfügbar seit: August 26, 2011